Allocation Projects

This is a list of projects identified in the Charleston County Comprehensive Transportation Plan and approved by County Council on an annual basis. The annual amount of funding for each category is listed below:

  • Local Paving - $2 Million
  • Bike and Pedestrian Path Enhancements - $500,000
  • Drainage Improvement Projects - $1 Million
  • Intersection Improvement Projects - $2 Million
  • County Council / Public Works Department Projects - $1 Million
  • Local Resurfacing Projects - $4 Million

The table below lists project names (in alphabetical order), allocation categories, the requesting agency or location, and current status. Links to photos, descriptions, and/or additional information is provided by clicking on the link where applicable.

 

PROJECT NAME CATEGORY REQUESTING AGENCY
or LOCATION
CURRENT STATUS
3rd Street East at East Huron Ave '10 Drainage Folly Beach Complete
4th Street West at West Ashley Ave '10 Drainage Folly Beach Construction
13th & 14th at Palm Blvd. Study '07 Intersection Isle of Palms Complete
21st Avenue '09 Resurfacing Isle of Palms Complete
34th Avenue '09 Resurfacing Isle of Palms Complete
41st at Palm Blvd. Study '07 Intersection Isle of Palms Complete
6th Street at 6th Avenue Sidewalks '07 Bike/Ped Mt. Pleasant Complete
6th Street East '10 Drainage
Construction
Abbapoola Road Paving Quick Start Johns Island Complete
Accabee Community Center '11 Local Paving North Charleston Complete
Albemarle Road '10 Resurfacing West Ashley Complete
Amanda Drive '06 Resurfacing James Island Complete
Amberly Road Sidewalk '07 Bike/Ped City of Charleston Complete
Amy Elsey Drive '10 Resurfacing West Ashley Complete
Anderson Avenue '09 Resurfacing James Island Complete
Andreas Way '10 Resurfacing North Charleston Complete
Annette Street '09 Resurfacing North Charleston Complete
Antler Drive Sidewalk '09 Local Paving North Charleston Complete
Aragon Street '08 Resurfacing North Charleston Complete
Ashe Street '06 Resurfacing Peninsula Complete
Ashley Hall Road Sidewalk '07 Local Paving West Ashley Complete
Ashley Phosphate at Cross County '11 Intersection North Charleston Design Underway
Ashley River Bridge Sidewalk Retrofit Feasibility Study '07 Bike/Ped City of Charleston Study Complete
Atlanta Drive '10 Resurfacing Mt. Pleasant Complete
Aubrey Drive '10 Resurfacing James Island Complete
Autumn Lane '06 Resurfacing West Ashley Complete
Awendaw Landing Road '10 CC/PWD Public Works Complete
Baker Hospital Boulevard '10 Resurfacing North Charleston Complete
Bay Tree Circle '08 Resurfacing Mt. Pleasant Complete
Bay Tree Court '08 Resurfacing Mt. Pleasant Complete
Bellwood Road '10 Resurfacing James Island Complete
Ben Sawyer Blvd. Sidewalk Improvements '07 Bike/Ped Mt. Pleasant Complete
Ben Sawyer Blvd. Multi-Use Path '09 Local Paving Sullivan Island Preliminary Plans Underway
Beresford Court '08 Resurfacing Mt. Pleasant Complete
Bethany Street '09 Resurfacing North Charleston Complete
Betsey Kerrison Parkway '10 Resurfacing Johns Island Complete
Blackground Rd '06 Local Paving Johns Island Permitting Underway
Blackrail Street '06 Resurfacing Mt. Pleasant Complete
Blidgen Road Quick Start West Ashley Complete
Bogard Street '09 Resurfacing Charleston Complete
Bolton Road '10 CC/PWD Design
Bonanza Road '06 Resurfacing West Ashley Complete
Bonds Avenue '08 Resurfacing North Charleston Complete
Bonham Drive '10 Resurfacing James Island Complete
Bradham Road '10 Resurfacing James Island Complete
Brian Road '06 Resurfacing West Ashley Complete
Buck Hall Court '08 Resurfacing Mt. Pleasant Complete
Buck Pond Road '10 Resurfacing Complete
Burning Tree Road '06 Resurfacing West Ashley Complete
Buskirk Street '09 Resurfacing North Charleston Complete
Butterfly Lane '11 Local Paving Awendaw Design Underway
Calhoun Street '07 Resurfacing Downtown Chas. Complete
Cameron Blvd '09 Resurfacing Isle of Palms Complete
Canton Square '10 Resurfacing Mt. Pleasant Complete
Cantwell Street '08 Resurfacing North Charleston Complete
Catalina Drive '10 Resurfacing James Island Complete
Carverwood Lane '10 Resurfacing West Ashley Complete
Caw Lane Local Paving Mt. Pleasant Design Underway
Center St. Intersection Improvements '11 Intersection Folly Beach Complete
Charing Cross Road '09 Resurfacing Charleston Complete
Charlestowne Drive Sidewalks '08 Local Paving West Ashley Complete
Charter Drive '10 Resurfacing Complete
Chelwood Circle '09 Resurfacing West Ashley Complete
Chippendale Road '06 Resurfacing North Charleston Complete
Clayton Drive '06 Resurfacing West Ashley Complete
Clearbrook Street '06 Resurfacing North Charleston Complete
Coakley Road Quick Start Mt. Pleasant Complete
Coaxum Road '09 Resurfacing Mt. Pleasant Complete
Covington Drive '10 Resurfacing Charleston Complete
Creekwood Road Quick Start West Ashley Complete
Cullowhee Circle '06 Resurfacing Mt. Pleasant Complete
Davis Road '08 CC/PWD St. Pauls On Hold
Deerwood Drive '09 Resurfacing Charleston Complete
Dagallies Lane Quick Start Mt. Pleasant Complete
Delhi Road '09 Resurfacing North Charleston Complete
Delta Street '10 Resurfacing North Charleston Complete
Dickens Street Sidewalk '09 Local Paving West Ashley Complete
Dills Bluff Road '08 Resurfacing James Island Complete
Doar Road '08 Resurfacing Awendaw Complete
Dorchester Road '07 Resurfacing North Charleston Complete
Dorchester Road at Michaux Parkway '11 Intersection North Charleston Construction
Dorchester Road Sidewalk '09 Local Paving North Charleston Complete
Dorchester Road at West Hill '11 Intersection North Charleston Permitting Underway
Downer Drive '10 Resurfacing James Island Complete
Duffield Road '09 CC/PWD Mt. Pleasant Complete
Durant Avenue '10 Resurfacing North Charleston Complete
Eagle Landing Blvd. '08 Resurfacing North Charleston Complete
East Ashley at 2nd St Drainage Improvements '11 Drainage Folly Beach Complete
East Ashley Avenue '07 Local Paving Folly Beach Complete
East Berry Street '06 Local Paving Lincolnville Complete
East Erie at 10th St Drainage Improvements '11 Drainage Folly Beach Construction
East Indian Avenue Drainage '09 Local Paving Folly Beach Complete
East Shore Lane '06 Resurfacing West Ashley Complete
Edenvale Road '08 Resurfacing Johns Island Complete
Egypt Road '09 Resurfacing Mt. Pleasant Complete
Eleanor Drive '10 Resurfacing Complete
Emerson Street '10 Resurfacing James Island Complete
EMS Medic 15 Entrance '10 CC/PWD Complete
End Drive Quick Start West Ashley Complete
Evans Road '10 Resurfacing Complete
Ezekiel Avenue '08 Resurfacing North Charleston Complete
F. Galliard Road '06 Resurfacing James Island Complete
Fairfiled Avenue '06 Resurfacing West Ashley Complete
Fairlawn Circle '06 Resurfacing Mt. Pleasant Complete
Fairway Drive '06 Resurfacing James Island Complete
Farmfield Avenue Multi-use Path '10 Bike/Ped Complete
Fern Place '06 Resurfacing North Charleston Complete
Fenwick Drive @ Wesley Drive '06 Local Paving West Ashley Project Cancelled
Ferguson Road '06 Resurfacing   Complete
Fire Tree Court '08 Resurfacing North Charleston Complete
Firth Street '06 Resurfacing Complete
Fort Johnson Road Sidewalk '07 Bike/Ped James Island Underway
Fort Pemberton Drive '10 Resurfacing North Charleston Complete
Fowler Court '08 Resurfacing East Cooper Complete
Frank Mallette Lane '08 Resurfacing North Charleston Complete
Ft. Lamar Road '06 Resurfacing James Island Complete
Gabe Road '08 CC/PWD St Pauls Complete
Gabe Road '08 Resurfacing St Pauls Complete
Gadsenville Road '06 Resurfacing McClellanville/ Awendaw Complete
Gardner Road '10 Resurfacing West Ashley Complete
Ginger Lane '08 Resurfacing Charleston/ North Charleston Complete
Glenn McConnell at Bairds Cove '11 Intersection West Ashley Permitting Underway
Glenn McConnell Parkway @ West Ashley Traffic Circle '10 Intersection West Ashley Complete
Glendale Drive & SC 61 '09 CC/PWD West Ashley Design Underway
Golden Pond Road '09 CC/PWD McClellanville Complete
Good Street '10 Resurfacing Complete
Granny's Lane '11 Local Paving Project Cancelled
Greenridge Road / Rivers Ave. Intersection '08 Intersection North Charleston Complete
Greenridge Road Sidewalks '08 Bike/Ped North Charleston Complete - Final Photo
Greenwood Road '08 CC/PWD North Charleston Complete
Grimbal Road Sidewalk Phase I '07 Local Paving James Island Complete
Grover Road '10 Resurfacing Johns Island Complete
Hamilton Road Quick Start West Ashley Complete
Harbor View Road '08 Resurfacing James Island Complete
Harley Street '10 Resurfacing North Charleston Complete
Harmony Street '10 Resurfacing West Ashley Complete
Harvey Avenue '10 Resurfacing North Charleston Complete
Hassell Avenue '09 Resurfacing North Charleston Complete
Hattie Street Improvements '07 Local Paving Mt. Pleasant Complete
Heathwood Drive '06 Resurfacing West Ashley Complete
Held Circle '09 Resurfacing James Island Complete
Highpoint Drive '10 Resurfacing Complete
Hwy 61 / 5th Ave Median Extension '06 Local Paving West Ashley Project Cancelled
Hillock Street '10 Resurfacing North Charleston Complete
Hillside Drive '10 Resurfacing North Charleston Complete
Holly Street '06 Resurfacing North Charleston Complete
Holmes Avenue '06 Resurfacing North Charleston Complete
Hopewell Court '08 Resurfacing East Cooper Complete
Hut / Abram Road Design '09 Drainage Johns Island Right of way and drainage easement plans underway
Hyde Park Road '09 Resurfacing West Ashley Complete
Idlewood Lane '10 Resurfacing West Ashley Complete
Independence Avenue '08 Resurfacing North Charleston Complete
International at I-526 WB '11 Intersection North Charleston Complete
International Blvd Sidewalk '08 Bike/Ped North Charleston Complete
International Blvd at Michaux '11 Intersection North Charleston Complete
Ireland Drive '06 Resurfacing North Charleston Complete
Island Overlook '06 Resurfacing Mt. Pleasant Complete
IOP/Rifle Range and IOP Widening '11 Intersection Mt. Pleasant Design Underway
Ivy Isle Drive '10 Resurfacing James Island Complete
Jack Road Quick Start Mt. Pleasant Complete
Jackwood Court '10 Resurfacing West Ashley Complete
Jadewood Drive '10 Resurfacing North Charleston Complete
James Bell Drive '10 Resurfacing North Charleston Complete
James Island Connector at Calhoun '07 Intersection Downtown Design Underway
James Jefferson Road '09 CC/PWD Mt. Pleasant Complete
James Prioleau Road '08 Local Paving James Island Complete
Jeb Stuart Road '10 Resurfacing James Island Complete
Jenkins Road '10 Resurfacing West Ashley Complete
Jessamine Road '10 Resurfacing West Ashley Complete
Joe Rivers Road '06 Resurfacing Isle of Palms Complete
John Street '06 Resurfacing Downtown Complete
Johns Island Safety & Intersection Improvements '07 Intersection Johns Island On Hold
Johnson Street '10 Resurfacing Charleston Complete
Joseph White Road '08 CC/PWD St. Pauls Final design and permitting
Judge Road '09 CC/PWD East Cooper Final design underway
Julius Robertson Quick Start East Cooper Complete
Julius Robertson Road '10 CC/PWD East Cooper Design
Jury Lane '10 Resurfacing North Charleston Complete
Keown Drive '09 Resurfacing James Island Complete
Killians Street. '09 Resurfacing Charleston Complete
Kirk Avenue Quick Start Charleston Complete
Landings Run '10 Resurfacing Mt. Pleasant Complete
Langley Street Sidewalk '11 Bike/Ped North Charleston Complete
Langston Street '10 Resurfacing North Charleston Complete
Larry Street '09 Resurfacing North Charleston Complete
Lauden Street '10 Drainage Isle of Palms Complete
Lauradell Avenue '09 Resurfacing North Charleston Complete
Laurens Street '09 Resurfacing Charleston Complete
Legareville Drainage Study '08 Drainage Johns Island Complete
Legareville Road '11 Drainage Johns Island Easement Acquisition Underway
Leichester Road '09 Resurfacing West Ashley Complete
Leonard Stoney Road '11 Local Paving Mt Pleasant Design Complete
Lenwood Blvd '10 Resurfacing Charleston Complete
Lillie and Rebecca Lane '07 Local Paving Mt. Pleasant Complete
Lincolnville Drainage Improvements Phase I '07 Drainage
Lincolnville Complete
Lincolnville Drainage Improvements Phase II '07 Drainage Lincolnville Construction
Lincoln High School Area Drainage 10' Drainage Construction
Live Oak Drive Sidewalk 10 Bike/Ped Complete
Lofton Court '06 Local Paving Complete
Long Point Road '07 Resurfacing East Cooper Complete
Longstreet Drive '10 Resurfacing James Island Complete
Lowell Drive '10 Resurfacing North Charleston Complete
Mabeline Road '06 Resurfacing North Charleston Complete
Mackey Lane Quick Start West Ashley Complete
MacQueen Avenue '08 Resurfacing Charleston/North Charleston Complete
Main Road / Marshfield '09 Local Paving West Ashley Complete
Maranda Holmes Street '09 Resurfacing Charleston Complete
Marigold Street '09 Resurfacing North Charleston Complete
Market Street '09 Resurfacing Charleston Complete
Marlin Road Improvements '11 Local Paving Johns Island/City of Charleston Complete
Marlow Drive '08 Resurfacing Complete
Marshland Drive '10 Resurfacing Charleston Complete
Mathis Ferry Road '07 Resurfacing Mt. Pleasant Complete
McClellanville Street Scape Plan '09 intersections McClellanville Construction
McDowell Avenue '08 Resurfacing North Charleston Complete
Meeting Street '07 Resurfacing Charleston/North Charleston Complete
Meeting Street Road '08 Resurfacing Charleston/North Charleston Complete
Melrose Drive '06 Resurfacing West Ashley Complete
Memminger Hall Subdivision Drainage '09 CC/PWD West Ashley Complete
Menola Avenue '06 Resurfacing West Ashley Complete
Mercia Lane '10 Resurfacing North Charleston Complete
Middle Hill Road Quick Start East Cooper Complete
Middle Street Drainage '10 Drainage Sullivans Island Coordinating with SCDOT
Middle Street '09 Resurfacing Sullivans Island Complete
Midland Park Road '08 Resurfacing Charleston/North Charleston Complete
Midview Drive '10 Resurfacing Ladson Complete
Midwood Drive '06 Resurfacing North Charleston Complete
Milford Street '06 Resurfacing Downtown Complete
Mill St. '06 Resurfacing Mt. Pleasant Complete
Mint Avenue '08 Resurfacing North Charleston Complete
Mint Street '08 Resurfacing Complete
Moffett Road Quick Start West Ashley Complete
Morrison Drive Handicap Ramps '07 Resurfacing Downtown Charleston Complete
Motley Lane '10 Resurfacing Charleston Complete
Mountainbrook Avenue '06 Resurfacing North Charleston Complete
Muirwood Circle '06 Resurfacing Mt. Pleasant Complete
Murraywood Road '06 Resurfacing Johns Island Complete
Mutual Drive '06 Resurfacing West Ashley Complete
North Bay Tree Court '08 Resurfacing Mt. Pleasant Complete
North Rhett and Remount Road Intersection '10 Intersections North Charleston Final Design Underway
New Road Improvements '09 Local Paving St. Pauls Construction
New Street '06 Resurfacing Mt. Pleasant Complete
Norman Street '09 Resurfacing Charleston Complete
North Oakridge Circle '06 Resurfacing North Charleston Complete
North Shore Drive '08 Resurfacing James Island Complete
Northbridge Study '08 Intersections Charleston Complete
Norview Drive '06 Resurfacing West Ashley Complete
Oakcrest Drive '10 Resurfacing James Island Complete
Oaklanding Road '06 Resurfacing Mt. Pleasant Complete
Oakwood Avenue '09 Resurfacing North Charleston Complete
Old Charleston Highway '06 Resurfacing Johns Island Complete
Old Collins Creek '06 Resurfacing McClellanville Complete
Old Georgetown Road '10 Resurfacing McClellanville Complete
Old Jacksonboro Road '06 Quick Start Complete
Old Park Road '10 Resurfacing North Charleston Complete
Orange Grove Road '08 Resurfacing West Ashley Complete
Orleans Road '10 Resurfacing West Ashley Complete
Overbrook Avenue '09 Resurfacing North Charleston Complete
Paddington Circle '09 Resurfacing West Ashley Complete
Park West Boulevard at Thomas Cario '07 Intersections Mt. Pleasant Complete
Paul Street '10 Resurfacing North Charleston Complete
Paulson Street '09 Resurfacing North Charleston Complete
Pavillion Drive '06 Resurfacing Isle of Palms Complete
Pennsylvania Drive '10 Resurfacing North Charleston Complete
Phillips Community Sidewalks '09 Local Paving Phillips Community Advertise for Construction Bids
Pinckney Street '10 resurfacing McClellanville Complete
Pinebrook Court '06 Resurfacing Mt. Pleasant Complete
Point Street
'10 Resurfacing Complete
Porcher Bluff Drainage Improvements Mt. Pleasant Complete
Porcher's Bluff Road '08 Resurfacing Complete
Portsmouth Circle '09 Resurfacing West Ashley Complete
Powell Road '10 Resurfacing North Charleston Complete
Preston Road '10 Resurfacing James Island Complete
Prince Street '10 Resurfacing North Charleston Complete
Putney Court '09 Resurfacing James Island Complete
Rachel Cook Way '09 CC/PWD Complete
Ralston Court '08 Resurfacing Mt. Pleasant Complete
Ramblewood Circle '06 Resurfacing Mt. Pleasant Complete
Reverend Parris Williams Road '08 Local Paving James Island Complete
Rifle Range Road '06 Resurfacing Mt. Pleasant Complete
Rifle Range Road Sidewalk '07 Bike/Ped Mt. Pleasant Complete
Rivers Avenue Sidewalk '07 Local Paving North Charleston Complete
Rivers Avenue Sidewalk at Northwoods '11 Bike/Ped North Charleston Advertise for Construction Bids
Riverland Drive Safety Improvements '10 Intersections Preliminary Design Underway
Robinson Street '06 Local Paving Ravenel Complete
Robert E. Lee Blvd '10 Resurfacing James Island Complete
Rock Street '10 Resurfacing North Charleston Complete
Royal Tern '06 Resurfacing Mt. Pleasant Complete
S. Anderson Avenue '09 Resurfacing James Island Complete
S. Aviation at Remount '11 Intersection North Charleston Complete
S. Aviation at W. Aviation '11 Intersection North Charleston Complete
S. Bay Tree Court '08 Resurfacing Mt. Pleasant Complete
S. Enston Avenue '09 Resurfacing Charleston Complete
S. Lenevar Drive '08 Resurfacing Charleston Complete
Salamander Road ''08 Resurfacing North Charleston Complete
Sanders Avenue '08 Resurfacing North Charleston Complete
Sandyver Court '08 Resurfacing West Ashley Complete
Sauldam Road Drainage '08 CC/PWD St. Pauls Complete
Savage Road '06 Resurfacing West Ashley Complete
Savage Street '06 Resurfacing Downtown Charleston Complete
SC 61 at SC 7 '07 Intersection West Ashley Design Underway
SC 61 at Tobias Gadson '07 Intersection West Ashley Complete
SC 7 at SC 171 '07 Intersection West Ashley Project on Hold
SC 171 Bike Ped '09 Local Paving West Ashley Final design and permitting plans underway
SC Highway 61 Multiuse Path '09 Local Paving West Ashley Preliminary Design
Scotia, Baker and Morrison
Drainage Improvements
'07 Drainage McClellanville Complete
Sea Islands Greenway '07 Intersection Johns Island Study Complete
Seagull Drive '06 Resurfacing Mt. Pleasant Complete
Sexton Drive '10 Resurfacing James Island Complete
Shakerwood Circle '06 Resurfacing Mt. Pleasant Complete
Sharon Avenue '06 Resurfacing West Ashley Complete
Shell House Road '11 CC/PWD Complete
Shem Creek Area Sidewalks '06 Local Paving Mt. Pleasant Complete
Shoreham Road '10 Resurfacing James Island Complete
Silver Leaf Cirlce '10 Resurfacing James Island Complete
Simms Street '10 Resurfacing Complete
Skylark Road '10 Resurfacing West Ashley Complete
Smoketree Court '08 Resurfacing North Charleston Complete
Snowden Road '10 Resurfacing Mt. Pleasant Complete
Southgrate Drive '06 Resurfacing Peninsula Complete
Sparrow Drive '11 Drainage Isle of Palms Complete
Springwood Circle '06 Resurfacing Mt. Pleasant Complete
Spruce Boulevard '10 Resurfacing North Charleston Complete
St Andrews Blvd Bike Lanes & SC-61 Resurfacing '12 Resurfacing City of Charleston and SCDOT Complete
St. Pauls Area Drainage Study '07 Drainage St Pauls Parrish Study Complete
St. Philip Street '09 Resurfacing Charleston Complete
Stiles Point School Sidewalk '09 Local Paving James Island Preliminary Design Underway
Stono Ferry Entrance '06 Local Paving Hollywood Complete
Storie Street '06 Resurfacing North Charleston Complete
Sumar Avenue '06 Resurfacing North Charleston Complete
Superior Street '10 Resurfacing Charleston Complete
Sutherland Avenue '09 Resurfacing Charleston Complete
Sutherland Court '09 Resurfacing Charleston Complete
Sutton Street '10 Resurfacing James Island Complete
Swinton Court '08 Resurfacing Mt. Pleasant Complete
Sweetgrass Creek Road '10 Resurfacing James Island Complete
Taylor Street '10 Resurfacing McClellanville Complete
Tedder Street '06 Resurfacing North Charleston Complete
Three Pence Lane '10 Resurfacing Complete
Tidal Pointe '10 Resurfacing Mt Pleasant Complete
Timothy Bostic Lane '09 CC/PWD Mt. Pleasant Complete
Timothy Street '06 Resurfacing West Ashley Complete
Tobias Gadson Blvd '09 Resurfacing West Ashley Complete
Torgeson Drive '06 Resurfacing North Charleston Complete
Trachelle Lane '08 Resurfacing West Ashley Complete
Trapier Drive '10 Resurfacing James Island Complete
Tumbleston Road Quick Start St. Pauls Complete
Union Heights Drainage '09 Drainage North Charleston Funding Only
US 17 at Longpoint Road '07 Intersection Mt. Pleasant Complete
US 17 at Main Road Study '09 Local Paving Johns Island Complete
US 17 at Old Jacksonboro Road '07 Intersection Ravenel Complete
US 17 at Tumbleston '07 Intersection Ravenel Complete
Vanderbrook Place '06 Resurfacing North Charleston Complete
Vantage Pointe '10 Resurfacing Mt. Pleasant Complete
Victoria Avenue Sidewalks '08 Local Paving North Charleston Complete
Village Road Quick Start West Ashley Complete
Wade Hampton Drive '10 Resurfacing James Island Complete
Wall Street '09 Resurfacing Charleston Complete
Wallace Drive '10 Resurfacing James Island Complete
Waterford Court '08 Resurfacing North Charleston Complete
Waterway Blvd. Bike Path '06 Local Paving Isle of Palms Complete
West Broad Street Quick Start Lincolnville Complete
West Enterprise Street '10 Resurfacing North Charleston Complete
West Harrison Road '10 Resurfacing Complete
West Hudson Avenue
Drainage Improvements
'07 Drainage Folly Beach Complete
West Huron Drainage '07 Drainage Folly Beach Complete
West Indian Avenue
Drainage Improvements
'07 Local Paving Folly Beach Complete
Weston Avenue '06 Resurfacing St. Andrews Complete
White Road '11 Local Paving Awendaw Design Underway
Wickfield Court '10 Resurfacing Complete
Willtown Road Sidewalk '09 Local Paving St. Pauls Permitting in progress
Wine Road Quick Start Johns Island Complete
Winston Street '10 Resurfacing St. Andrews Complete
Woodgreen Circle '06 Resurfacing Mt. Pleasant Complete
Woodlawn Subdivision Drainage '08 CC/PWD North Charleston Complete
Wren Drive '06 Resurfacing North Charleston Complete
Wright Street '08 Resurfacing North Charleston Complete
Wyncliff Drive '10 Resurfacing North Charleston Complete